Vol. XVIII · Free shipping $75+ · Read the collection
Feature · Product Review

262997/1949 - West Midlands Joint Electricity Authority No. 1 - Ruston Works' Green - DCC Sound Fitted Livery_VTG and may not be fully

262997/1949 - West Midlands Joint Electricity Authority No. 1 - Ruston Works' Green - DCC Sound Fitted Livery_VTG and may not be fullyRuston 262997 was built new for the West Midlands Joint Electricity Authority, leaving Boultham Works on 27 January 1949 for the Birchills Power Station in Walsall. Birchills came under the control of the WMJEA in 1925 and in 1944 it was decided that a new Station, Birchills B, should be constructed. The new power station, called 'Walsall B', officially opened on 30th September, 1949, and 262997 was responsible for shunting at the new Power Station,

SKU: 53137901907 · From metron-ms.com

4.6
USD187.47 USD230.47

Pay in 4 interest-free payments of $46.87 Learn more

Shipping Estimate
USA
  • USA
  • CAN

Ships within 48 hours · Estimated delivery Aug 2 - Aug 7

Description

and may not be fully indicative of the final model

plus door master controls and four additional small boxes per side that contain the magnetic switches on the real thing for door/hopper operation

the now renumbered 68535 remained in Scotland allocated to Dundee Shed 62B

The North Eastern Region employed a number of 88DS in the Civil Engineering Department

359 came from an earlier batch of ten locomotives built at Stratford in 1892 and was rebuilt in 1904 into the R24r Class

262997/1949 - West Midlands Joint Electricity Authority No. 1 - Ruston Works' Green - DCC Sound Fitted Livery_VTG and may not be fullyRuston 262997 was built new for the West Midlands Joint Electricity Authority, leaving Boultham Works on 27 January 1949 for the Birchills Power Station in Walsall. Birchills came under the control of the WMJEA in 1925 and in 1944 it was decided that a new Station, Birchills B, should be constructed. The new power station, called 'Walsall B', officially opened on 30th September, 1949, and 262997 was responsible for shunting at the new Power Station,

Exchange/Return Notes
  • We offer a 30-day return/exchange service after receiving.
  • Final sale items are not eligible for returns or exchanges.
  • To process your return/exchange, please contact us at [email protected]
  • Please click here for more details>>> Return & Exchange Policy

You may also like

recommand products